skip to Main Content

Project: Reach new heights

This project was born from the customer’s need to design a new reach truck for narrow aisles. The machine will be used for “Drive-in” applications combined with an LGV reach system. This system optimizes space inside the warehouse in three dimensions: width, length and height.

In particular, this vehicle needs maximum precision as the pallets are stored inside guides on shelves so a small error in positioning is allowed. The working environment of this machine has dictated several constraints during the design, challenges that have allowed Eping to enhance its knowledge and know-how. The design started from a first comparison between the two players at the table: the customer with his experience and our office with innovative technical solutions. Once the machine layout was defined, we took care to implement the solutions and delivered a winning product on the market. This project can be divided into two macro categories: Machine and mast. In fact, in addition to the main body, the project specification also required the design of a new mast to be combined with the vehicle.

NEWS

EPING participates in GIS EXPO for the fifth time

EPING participates in GIS EXPO for the fifth time

30 September 2025

GIS Expo 2025, another memorable edition From September 25 to 27, 2025, Piacenza Expo hosted the tenth edition of GIS…

Happy birthday, Eping!!

Happy birthday, Eping!!

On 04/04 Eping turned 9 years old, and we couldn’t be prouder! It’s been nine years since that little “office”…

EPING at Spazio Impresa: the value of engineering education

EPING at Spazio Impresa: the value of engineering education

3 February 2025

We are proud to have taken part in an episode of Spazio Impresa, the program by Confindustria Piacenza broadcast on…